Wind Turbines Headed for Honda Transmission Plant in Ohio

Juhl Wind Turbines – Courtesy of and Copyright Juhl all rights reserved

Ken Zino of AutoInformed.com on Wind Turbines Headed for Honda Transmission Plant in Ohio

Click for more.

The turbines, with blades ~160 feet long, will be installed on 260-foot towers on Honda Transmission property, which is suited for a maximum of two wind turbines. Last June, the Washington Township Board of Zoning Appeals approved a variance to the height limitation for the wind turbines.

Studies commissioned by Honda claim that wind-generated power is a cost-effective source of electricity for the plant and that the project will not adversely impact local wildlife or the environment. The two wind turbines based on their location and actual wind speeds will have a combined outputĀ  estimated at 10,000-megawatt hours per year.

Globally, Honda has voluntary goals to reduce the environmental impact of its products and manufacturing operations by 2020. This includes a 30% reduction in CO2 emissions from Honda products, and significant CO2 reductions from the company’s plants and other operations, compared with year 2000 levels.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *